Rule 108: Code not to apply in certain mines

Reviewed by Finin2min Editorial Desk · Last reviewed 30 August 2026

Rule 108 — Governs code not to apply in certain mines and the rights, duties, powers or procedure expressly stated in this rule. Key operative text: (1).- The provision of the Code, except those contained in sections 35,38, 40,41 and 44 shall not apply to – (i) any mine or part thereof in which excavation is being made for prospecting purposes only and not for the purpose…

Full notified rule textG.S.R. 345(E), 8 May 2026Source checked: 20 August 2026
Rule status

Occupational Safety, Health and Working Conditions (Central) Rules, 2026 were finally notified under G.S.R. 345(E), 8 May 2026. The Central Rules must be read with the Code and any later amendment/corrigendum.

Official Gazette

Open the notified Rules ↗

Finin2min analysis — operative rule mechanics

Operative clauses

  • (1).- The provision of the Code, except those contained in sections 35,38, 40,41 and 44 shall not apply to – (i) any mine or part thereof in which excavation is being made for prospecting purposes only and not for the purpose of obtaining minerals for use and sale:
  • (b) the depth of the excavation measured from its highest to its lowest point nowhere exceeds six meters or, in the cases of an excavation in coal, fifteen meters; and (c) no part of such excavation extends below superjacent ground;
  • (2) As soon as an establishment becomes a mine, the employer of the mine shall give notice electronically, to the Inspector-cum-Facilitator within seven days from the date it becomes a mine.
  • (3) Notwithstanding anything contained in sub-rule (1) the Central Government may declare by an order in writing require that all provisions of the Code shall be applicable, in such mine or part thereof subject to such conditions as may specify therein.

Provisos / explanations

  • Provided that – (a) not more than twenty persons are employed on any one day in connection with any such excavation; (b) the depth of the excavation measured from its highest to its lowest point nowhere exceeds six meters or, in the cases of an excavation in coal, fifteen meters; and (c) no part of such excavation extends below superjacent ground; (ii)…

Thresholds & timelines

  • Provided that – (a) not more than twenty persons are employed on any one day in connection with any such excavation;
  • Provided that- (a) the working do not extend below superjacent ground; or (b) where it is an opencast workings- i. the depth of the excavation measured from its highest to its lowest point not anywhere exceeds six meters; ii. the number of persons employed on any one day does not exceed fifty; and iii. explosives are not used in connection with the…
  • (2) As soon as an establishment becomes a mine, the employer of the mine shall give notice electronically, to the Inspector-cum-Facilitator within seven days from the date it becomes a mine.

Full notified text — Rule 108

English rule text transcribed from the final official 2026 Gazette PDF; layout is normalised for web reading. The Gazette controls.
108. Code not to apply in certain mines.- (1).- The provision of the Code, except those contained in
sections 35,38, 40,41 and 44 shall not apply to –
    (i) any mine or part thereof in which excavation is being made for prospecting purposes only and not
        for the purpose of obtaining minerals for use and sale:
             Provided that –
         (a) not more than twenty persons are employed on any one day in connection with any such
               excavation;
         (b) the depth of the excavation measured from its highest to its lowest point nowhere exceeds
               six meters or, in the cases of an excavation in coal, fifteen meters; and
         (c) no part of such excavation extends below superjacent ground;
    (ii) any mine engaged in the extraction of kankar, murram, laterite, boulder, gravel, shingle, ordinary
    sand (excluding moulding sand, glasss and other mineral sands), ordinary clay (excluding kaolin,
    china clay, white clay or fire clay), building stone, slate, road metal, earth, fullers earth, marl, chalk
    and limestone:
    Provided that-
           (a) the working do not extend below superjacent ground; or
           (b) where it is an opencast workings-

                i.     the depth of the excavation measured from its highest to its lowest point not anywhere
                       exceeds six meters;
               ii.     the number of persons employed on any one day does not exceed fifty; and
              iii.     explosives are not used in connection with the excavation.
      (2) As soon as an establishment becomes a mine, the employer of the mine shall give notice
      electronically, to the Inspector-cum-Facilitator within seven days from the date it becomes a mine.
      (3) Notwithstanding anything contained in sub-rule (1) the Central Government may declare by an
      order in writing require that all provisions of the Code shall be applicable, in such mine or part thereof
      subject to such conditions as may specify therein.

Application and evidence

  1. Primary statutory test — (1).- The provision of the Code, except those contained in sections 35,38, 40,41 and 44 shall not apply to – (i) any mine or part thereof in which excavation is being made for prospecting purposes only and not for the purpose of obtaining minerals for use and sale:
  2. Additional operative limb — (b) the depth of the excavation measured from its highest to its lowest point nowhere exceeds six meters or, in the cases of an excavation in coal, fifteen meters; and (c) no part of such excavation extends below superjacent ground;
  3. Qualification / exception to test — Provided that – (a) not more than twenty persons are employed on any one day in connection with any such excavation; (b) the depth of the excavation measured from its highest to its lowest point nowhere exceeds six meters or, in the cases of an excavation in coal, fifteen meters; and (c) no part of such excavation extends below superjacent ground; (ii)…
  4. Numerical or timing control — Provided that – (a) not more than twenty persons are employed on any one day in connection with any such excavation;
  5. Code Section mapping — 67, 68, 69, 70, 71, 72, 73. Read the mapped provision together with this text rather than treating the concordance as a substitute for it.
  6. Evidence file — retain facts and records proving the role/status of: Employer, Central Government, Inspector-cum-Facilitator.

Cross-references & prescribed forms

Forms

No form is directly mapped in the current rule register.

Worked example

For an establishment affected by code not to apply in certain mines, the compliance owner should identify the applicable sector and authority, document the prescribed control/notice/record and retain inspection or training evidence. A text point to test is: “Provided that – (a) not more than twenty persons are employed on any one day in connection with any such excavation;” Also test the express qualification/proviso before concluding the result. Reconcile the mapped Code Section(s) 67, 68, 69, 70, 71, 72, 73.

Illustrative only. Use the exact notified rule, prescribed form and competent authority.

Q&A — Rule 108

What is Rule 108 of the Occupational Safety, Health and Working Conditions (Central) Rules, 2026?

Rule 108 — Governs code not to apply in certain mines and the rights, duties, powers or procedure expressly stated in this rule. Key operative text: (1).- The provision of the Code, except those contained in sections 35,38, 40,41 and 44 shall not apply to – (i) any mine or part thereof in which excavation is being made for prospecting purposes only and not for the purpose…

What does Rule 108 require or permit?

A principal operative clause extracted from the notified rule is: “(1).- The provision of the Code, except those contained in sections 35,38, 40,41 and 44 shall not apply to – (i) any mine or part thereof in which excavation is being made for prospecting purposes only and not for the purpose of obtaining minerals for use and sale:” Read it with all sub-rules and provisos below.

Does Rule 108 contain a proviso or explanation?

Yes. One extracted qualification is: “Provided that – (a) not more than twenty persons are employed on any one day in connection with any such excavation; (b) the depth of the excavation measured from its highest to its lowest point nowhere exceeds six meters or, in the cases of an excavation in coal, fifteen meters; and (c) no part of such excavation extends below superjacent ground; (ii)…”

What deadline, period, percentage or amount appears in Rule 108?

The rule contains this numerical/time expression: “Provided that – (a) not more than twenty persons are employed on any one day in connection with any such excavation;” Apply it only in its notified context.

Which Code sections are linked to Rule 108?

The current concordance maps Rule 108 to Section(s) 67, 68, 69, 70, 71, 72, 73.

When did Rule 108 come into force?

The final Central Rules were notified as G.S.R. 345(E), 8 May 2026; Rule 1 states that the Rules come into force on publication. Check any later amendment or corrigendum before reliance.

Primary sources

← PreviousNext →
Jurisdiction note: This is the Central Rule corpus. Check State rules/notifications where the State Government is the appropriate Government and check later Gazette amendments before acting.
Finin2min · Finance & Law Explained in 2 Minutes
Editorial owner: CA Nikhil Gupta · Official-source set checked 20 August 2026; provision-level professional review remains matter-specific
Educational purposes only. Exact notified law, rules, schemes, regulator instruments, judicial decisions, state overlays, portal behaviour and facts must be checked before reliance. Verify with a qualified professional.