Not every construction project falls under RERA — the Act draws a specific size line, and projects below it, along with a handful of other defined categories, sit outside mandatory registration entirely.
A real estate project generally requires RERA registration if it involves land area exceeding 500 square metres, or the number of apartments proposed to be developed exceeds 8 (counting all phases) — meeting either condition alone is sufficient to trigger the registration requirement; a project doesn't need to breach both thresholds.
A registered project comes with a defined RERA registration number, a specific completion timeline the promoter has committed to and disclosed, mandatory escrow protection for buyer funds (see our related article), and a regulatory forum (the state RERA Authority) to pursue delay/deficiency claims against. An unregistered, below-threshold project doesn't carry these specific statutory protections in the same form — buyers of smaller projects need to rely more heavily on the strength of the builder-buyer agreement itself and general consumer/contract law.
A registering promoter must disclose project details (land title, encumbrances, approved layout plans, proposed completion timeline), deposit the required percentage of buyer funds into a project-specific escrow account, and file periodic project-progress updates with the RERA Authority — registration is not a one-time formality but an ongoing disclosure and compliance obligation for the life of the project.
Before booking in any project, checking the project's RERA registration number on the relevant state RERA Authority's website (which typically discloses registration status, promoter details, and project timeline) is a basic, accessible first step — a buyer should be cautious of any project claiming RERA-exempt status without a clear, verifiable basis for that exemption.
Use the current official instrument, portal or regulator publication before acting. This panel separates the category authority from page-specific references.
The prior page did not embed a page-specific external source. The category authority above is the minimum verification starting point; a specific instrument should be added during the next substantive editorial review.