Following Action Ispat and Power v. Shyam Metalics and A. Navinchandra Steels v. SREI Equipment Finance, even after admission, winding-up order and appointment of the official liquidator the Company Court has discretion to transfer a winding-up petition to the NCLT, and it ought to do so unless an irreversible or irretrievable stage or act has occurred; payment of the liquidator's expenses is not a precondition.

By CA Nikhil Gupta · Reviewed against the retained judgment 2026-10-13

Finin2min two-minute summary

A security services contractor, engaged by the Official Liquidator to guard assets of a company in liquidation, appealed against orders transferring the winding-up petitions to the NCLT, because its bills remained unpaid. The Division Bench held that unpaid bills were not an irreversible stage and the contractor could claim before the NCLT.

Court
Calcutta High Court
Case
APOT/316/2023 WITH CP/49/2016
Date
2026-05-11
Bench
Debangsu Basak, Md. Shabbar Rashidi
Subject
Banking, Insolvency and Finance
Disposition
Appeals dismissed; transfer of winding-up petitions upheld
Result
APOT/316/2023 and APOT/79/2026 were dismissed along with connected applications, with no order as to costs; delay in the second appeal was condoned and leave granted.
Neutral citation
2026:CHC-OS:177-DB
CNR
Not stated in retained copy
Connected matters
None recorded
Relevant period
See facts and judgment
Read complete judgment PDFPublic court copyOfficial court portal

What happened

The appellant, Shiva Shakti Security Services, was appointed by the Official Liquidator to provide security guards to protect and preserve the assets of Martina Boi Genics Pvt. Ltd. (in liquidation), whose winding-up order was made on 21 November 2016 in CP/49/2016. Its bills remained unpaid; the Official Liquidator said the secured creditor had not paid. The first appeal, APOT/316/2023, challenged the order of 18 January 2023 in IA No. CA/1/2021 in CP/49/2016 transferring that petition and connected applications to the NCLT, Kolkata, in view of the order of 26 September 2022 in CP/347/2015. The second, APOT/79/2026, challenged that order of 26 September 2022, which had applied Action Ispat and Power v. Shyam Metalics and Energy Ltd., (2021) 2 SCC 641, and A. Navinchandra Steels v. SREI Equipment Finance, (2021) 4 SCC 435. The appellant said the transfer would leave its claim for protecting the assets not treated as an expense in the corporate insolvency process, and relied on orders of the Bombay Company Court in Action Barter in which transfer was conditional on payment of the liquidator's expenses.

Questions before the court

Why the court ruled this way

In Action Ispat, the Supreme Court held that even after admission and the appointment of a company liquidator, the Company Court has discretion to transfer a petition to the NCLT, and set out how that discretion is to be exercised (paragraphs 17 and 18). The Bench read Action Ispat as laying down a test, not as making payment of the liquidator's expenses a sine qua non; the direction there was given in the context of a secured creditor's pending section 7 application (paragraph 21). In Navinchandra Steels, a secured creditor sought to sell the company's assets, and the same tests were applied (paragraph 23). Both tests apply on the issue of transfer: as long as no sale of the company's property took place and nothing irreversible was done, a petition ought to be transferred (paragraph 25). No irreversible or irretrievable act or stage was shown (paragraph 26). Section 529 of the Companies Act, 1956 did not help; the appellant can make its claim before the NCLT, and non-payment does not make the petition reach an irreversible stage (paragraph 27).

Controlling point

No irreversible stage had occurred, so there was no error in the transfer orders.

Order and next steps

In ACO 1 of 2026 in the second appeal, delay was condoned and leave granted. Both appeals, APOT/316/2023 and APOT/79/2026, were dismissed together with all connected applications, with no order as to costs.

Practical implications

A creditor or contractor of a company in liquidation should expect the winding-up petition to be transferred to the NCLT and file its claim there; unpaid dues alone do not stop the transfer.

Limits of this ruling

Law and judgment source

The linked PDF is a complete public court-copy document. The official court portal is provided for independent verification; a stable judgment-specific official link was not independently established.

Source checked: 2026-10-13 · Judgment paragraphs: paragraphs 1–32 · Later case history: not verified. Verify appeals, stays and subsequent orders before reliance.