Vineet Goel v. A.N. Buildwell Private Limited & Ors. and connected matters

VALIDATED · ACTUAL COURT-COPY PDF
Court
Delhi High Court
Case number
CO.APP. 11/2020 and connected matters
Decision date
2026-08-13
Bench
Anil Kshetrapal and Shail Jain JJ.
Neutral citation
Not stated in retained copy
CNR
DLHC010236272020
Disposition
Appeals allowed; impugned order set aside and consequential directions issued.
Later history
Not verified — check the official court record for later history before reliance (as of 13 Sep 2026)
Open local judgment PDFPublic complete-copy sourceOfficial court portal

Source transparency: The local PDF is the unchanged public court-copy download. The official court portal is identified separately and is not presented as a judgment-specific deep link. Verify the official record and subsequent history before reliance.

Holding (ratio)

Conditional votes could not be counted as unconditional consent when testing approval of a company revival scheme.

Operative order (extract)

78. The Appeals are, accordingly, allowed and the Impugned Judgment dated 17.02.2020 sanctioning the Revival Scheme is set aside. The matter is remanded to the learned Single Judge for fresh consideration of the Revival Scheme and the objections thereto, in accordance with law. 82. The present batch of Appeals, along with pending applications, shall stand disposed of.

Scope limits

The decision is confined to the issues decided on the retained record; verify the complete judgment and subsequent history before reliance.

Sources and completeness

PDF status
Complete searchable public court copy, retained unchanged
PDF pages
32
Extracted words
7,908
Public report
Read the public report
PDF SHA-256
c60142dba573e698c337f2913fce0132ed656931115edec385606a2b082f51d7
Complete searchable judgment text
                  $~



                  *      IN THE HIGH COURT OF DELHI AT NEW DELHI



                  %                               Judgment reserved on: 04.08.2026



                                               Judgment pronounced on: 13.08.2026



                                                  Judgment uploaded on: 13.08.2026



                  #      CNR No. DLHC010236272020



                  +      CO.APP. 11/2020, CM APPL. 14993/2021, CM APPL.



                         55543/2023, CM APPL. 68286/2025, CM APPL. 68289/2025



                         and CM APPL. 13172/2026



                         VINEET GOEL                                  .....Appellant



                                         Through: Mr. Animesh Sinha, Mr.



                                                    Shubham Budhiraja, Ms. Ishita



                                                    Pandey, Advs.



                                         versus



                         A.N. BUILDWELL PRIVATE LTD & ORS. .....Respondents



                                         Through: Mr. Vikrant Pachnanda, Mr.



                                                    Mukul Katyal, Advs. for R-3.



                                                    Mr. Shivank Pratap Singh, Ms.



                                                    Priya Singh, Mr. Samyak Jain,



                                                    Advs. for SELFC.



                                                    Mr. Shlok Chandra, Mr



                                                    Parikshit Singh Bhati, Ms



                                                    Lolita Crasta, Advs. for



                                                    Applicant in CM APPL.



                                                    68286/2025.



                                                    Ms. Ruchi Sindhwani, Ms.



                                                    Megha Bharara, Adv. for OL.



                                                    Mr. Nidhi Raman, CGSC with



                                                    Mr. Arnva Mittal, Adv. for



                                                    RoC.



                                                    Mr. Arnav Kumar, Ms.



                                                    Akanksha Singh, Ms. Preeti



                                                    Pant, Advs. for Spire Woods



                                                    Residents Welfare Association.







                  #      CNR No. DLHC010275812020



                  +      CO.APP. 12/2020, CM APPL. 14995/2021, CM APPL.



                         13138/2026 and CM APPL. 13139/2026



                         VIJAY GUPTA                               .....Appellant



                                         Through: Ms. Pragya Kumar, Adv.



Signature Not Verified



                                         versus



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                  Page 1 of 32



12:40:38



                         A N BUILDWELL PRIVATE LIMITED & ORS.



                                                               .....Respondents



                                      Through: Mr. Vikrant Pachnanda, Mr.



                                                Mukul Katyal, Advs. for R-3.



                                                Mr. Shlok Chandra, Mr



                                                Parikshit Singh Bhati, Ms



                                                Lolita Crasta, Advs. for



                                                Applicant in CM APPLs.



                                                13138-39/2025.



                                                Ms. Ruchi Sindhwani, Ms.



                                                Megha Bharara, Adv. for OL.



                                                Mr. Nidhi Raman, CGSC with



                                                Mr. Arnva Mittal, Adv. for



                                                RoC.



                                                Mr. Arnav Kumar, Ms.



                                                Akanksha Singh, Ms. Preeti



                                                Pant, Advs. for Spire Woods



                                                Residents Welfare Association.







                  #      CNR No. DLHC010275772020



                  +      CO.APP. 13/2020, CM APPL. 14997/2021 and CM APPL.



                         68294/2025



                         SONU GARG                                    .....Appellant



                                         Through: Mr. Vijay Gupta, Mr. Pardeep



                                                  Chauhan, Advs.



                                         versus



                         A N BUILDWELL PRIVATE LIMITED & ORS.



                                                                 .....Respondents



                                         Through: Mr. Vikrant Pachnanda, Mr.



                                                  Mukul Katyal, Advs. for R-3.



                                                  Mr. Shlok Chandra, Mr



                                                  Parikshit Singh Bhati, Ms



                                                  Lolita Crasta, Advs. for



                                                  Applicant in CM APPL.



                                                  68294/2025.



                                                  Ms. Ruchi Sindhwani, Ms.



                                                  Megha Bharara, Adv. for OL.



                                                  Mr. Nidhi Raman, CGSC with



                                                  Mr. Arnva Mittal, Adv. for



                                                  RoC.







Signature Not Verified



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                  Page 2 of 32



12:40:38



                  #      CNR No. DLHC010118932021



                  +      CO.APP. 4/2021 and CM APPL. 68290/2025



                         VIJAY SHANKAR PANDEY                         .....Appellant



                                          Through: Mr. Lakshay Khanna, Adv.



                                          versus



                         A N BUILDWELL PVT LTD & ORS.           .....Respondents



                                          Through: Mr. Vikrant Pachnanda, Mr.



                                                   Mukul Katyal, Advs. for R-3.



                                                   Mr. Shlok Chandra, Mr



                                                   Parikshit Singh Bhati, Ms



                                                   Lolita Crasta, Advs. for



                                                   Applicant in CM APPL.



                                                   68290/2025.



                                                   Ms. Ruchi Sindhwani, Ms.



                                                   Megha Bharara, Adv. for OL.



                                                   Mr. Nidhi Raman, CGSC with



                                                   Mr. Arnva Mittal, Adv. for



                                                   RoC.



                                                   Mr. Arnav Kumar, Ms.



                                                   Akanksha Singh, Ms. Preeti



                                                   Pant, Advs. for Spire Woods



                                                   Residents Welfare Association.







                  #      CNR No. DLHC010149802021



                  +      CO.APP. 5/2021



                         VIJAY SHANKAR PANDEY                       .....Appellant



                                        Through: Mr. Lakshay Khanna, Adv.



                                        versus



                         M/S A N BUILDWELL PVT LTD & ORS. .....Respondents



                                        Through: Mr. Vikrant Pachnanda, Mr.



                                                 Mukul Katyal, Advs. for R-3.



                                                 Mr. Shlok Chandra, Mr



                                                 Parikshit Singh Bhati, Ms



                                                 Lolita Crasta, Advs. for R-4.



                                                 Ms. Ruchi Sindhwani, Ms.



                                                 Megha Bharara, Adv. for OL.



                                                 Mr. Nidhi Raman, CGSC with



                                                 Mr. Arnva Mittal, Adv. for



                                                 RoC.



                                                 Mr. Arnav Kumar, Ms.



                                                 Akanksha Singh, Ms. Preeti



Signature Not Verified



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                  Page 3 of 32



12:40:38



                                                              Pant, Advs. for Spire Woods



                                                              Residents Welfare Association.







                  #      CNR No. DLHC010300742021



                  +      CO.APP. 7/2021, CM APPL. 33578/2021, CM APPL.



                         13140/2026 and CM APPL. 13141/2026



                         RENUKA KULKARNI                               .....Appellant



                                         Through: Mr. Lakshay Khanna, Adv.



                                         versus



                         A.N. BUILDWELL PVT. LTD. (THROUGH OFFICIAL



                         LIQUIDATOR) & ORS.                      .....Respondents



                                         Through: Mr. Vikrant Pachnanda, Mr.



                                                    Mukul Katyal, Advs. for R-3.



                                                    Mr. Shlok Chandra, Mr



                                                    Parikshit Singh Bhati, Ms



                                                    Lolita Crasta, Advs. for



                                                    Applicant in CM APPLs.



                                                    13140-41/2026.



                                                    Ms. Ruchi Sindhwani, Ms.



                                                    Megha Bharara, Adv. for OL.



                                                    Mr. Nidhi Raman, CGSC with



                                                    Mr. Arnva Mittal, Adv. for



                                                    RoC.



                         CORAM:



                         HON'BLE MR. JUSTICE ANIL KSHETARPAL



                         HON'BLE MS. JUSTICE SHAIL JAIN



                                              JUDGMENT







                  ANIL KSHETARPAL, J.:







                  1.     Vide this common Judgment, six (06) connected Company



                  Appeals, namely, Company Appeal Nos.11/2020, 12/2020, 13/2020,



                  4/2021, 5/2021 and 7/2021, preferred under Section 483 of the



                  Companies Act, 1956 [hereinafter referred to as „Companies Act‟],



                  challenging the common Judgment dated 17.02.2020 passed by the



                  learned Single Judge in Company Petition No.6/2019, whereby the



                  Scheme of Compromise and Arrangement [hereinafter referred to as



Signature Not Verified



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                         Page 4 of 32



12:40:38



                  „Revival Scheme‟] under Sections 391 to 393 of the Companies Act



                  came to be sanctioned, shall stand decided by this common judgment.







                  2.     The principal question which arises for consideration is whether



                  the learned Single Judge was justified in sanctioning the Revival



                  Scheme, having regard to the objections raised by the Appellants, who



                  are allottees/investors in the projects of Respondent No.1, A.N.



                  Buildwell Private Limited [hereinafter referred to as „the Company‟].



                  The Appellants principally contend that the Revival Scheme is neither



                  fair nor equitable to the allottees, the interests of different classes of



                  allottees have not been adequately protected, the Revival Scheme as



                  sanctioned materially departs from the one placed before the



                  stakeholders for approval, and the learned Single Judge failed to



                  subject the Revival Scheme to the degree of judicial scrutiny



                  contemplated under Sections 391 to 393 of the Companies Act.







                  3.     Since all the Appeals arise out of the common Judgment dated



                  17.02.2020 and involve overlapping questions of fact and law, they



                  were heard analogously and are being decided by this common



                  Judgment. For the sake of convenience and to avoid repetition,



                  Company Appeal No.11/2020 is being treated as the lead appeal.



                  Accordingly, the factual matrix is being noticed principally from the



                  pleadings in the said Appeal, while the distinct contentions and



                  individual grievances raised in the remaining Appeals shall be dealt



                  with at the appropriate stage.







                  FACTUAL MATRIX:







                  4.     In order to comprehend the controversy involved in the present



                  Appeals, the relevant facts, in brief, are required to be noticed.



Signature Not Verified



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                         Page 5 of 32



12:40:38



                  5.     The Company was engaged in the business of development of



                  real estate projects in Gurugram, Haryana. Its projects comprised both



                  commercial and residential developments, including the commercial



                  project known as „Spire Edge‟, consisting of different commercial



                  blocks and office spaces, and the residential project known as „Spire



                  Woods‟. In order to finance the development of the aforesaid projects,



                  the Company invited bookings from members of the public by



                  allotting commercial units, office spaces and residential units under



                  separate Builder Buyer Agreements [hereinafter referred to as



                  „BBAs‟].







                  6.     The Appellants are amongst such allottees/investors who



                  booked commercial and/or residential units in the aforesaid projects



                  pursuant to the respective BBAs executed with the Company. It is



                  their case that substantial amounts, and in several cases the entire sale



                  consideration, stood paid to the Company in terms of the respective



                  allotments.







                  7.     According to the Appellants, the BBAs envisaged completion



                  of the projects and delivery of possession within the stipulated



                  timelines. In respect of the commercial units in the Spire Edge project,



                  the Company had also assured returns @12% per annum on the



                  amounts deposited till completion of the project. The BBAs further



                  stipulated that in the event the project was not completed by the



                  agreed date, the Company would be liable to pay compensation for



                  delay at the rate of Rs.55/- per square foot per month, apart from the



                  assured returns, besides other contractual obligations incorporated



                  therein. The BBAs further provided that, in the event of default by the



                  Company in making payments due to the allottees, interest @1% per



Signature Not Verified



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                       Page 6 of 32



12:40:38



                  month would be payable on the defaulted amount.







                  8.     It is the common case of the Appellants that despite receiving



                  substantial consideration from the allottees, the Company failed to



                  complete the projects within the stipulated timelines envisaged under



                  the respective BBAs. The Appellants allege that possession was either



                  not offered in accordance with the contractual stipulations or was



                  offered without the requisite statutory approvals, including the



                  completion/occupation certificate, resulting in disputes between the



                  Company and the allottees. It is further their case that the Company



                  failed to honour various contractual obligations under the BBAs.







                  9.     In addition to the aforesaid common grievances, the Appellant



                  in Company Appeal No.11/2020 has specifically pleaded that



                  although the BBAs represented that the land on which the Spire Edge



                  project was developed had been allotted by the Haryana State



                  Industrial and Infrastructure Development Corporation („HSIIDC‟) on



                  a freehold basis and that the units would be allotted on a perpetual



                  lease basis, he was informed, at the stage of the offer of possession,



                  that the lease deeds would be executed only for a period of twenty-



                  nine (29) years at a time, renewable in accordance with the prevailing



                  policy of HSIIDC. It is further alleged that despite repeated requests,



                  the Company failed to furnish the requisite completion certificate.



                  According to the said Appellant, upon issuance of the possession



                  letter, the Company also discontinued payment of the assured returns



                  and failed to discharge its contractual obligation of paying delay



                  compensation and interest on the defaulted amounts, ultimately



                  compelling him to initiate civil and criminal proceedings against the



                  Company and its Directors.



Signature Not Verified



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                      Page 7 of 32



12:40:38



                  10.    Owing to mounting financial difficulties and the Company‟s



                  alleged failure to discharge its financial and contractual obligations



                  towards various stakeholders, including the allottees, several winding-



                  up petitions came to be instituted before this Court. During the



                  pendency of the winding-up proceedings, the Official Liquidator



                  attached to this Court was appointed as the Provisional Liquidator of



                  the Company. Thereafter, a proposal for revival of the Company by



                  way of Revival Scheme was placed before the learned Single Judge.



                  Pursuant to the orders passed by the learned Single Judge, meetings of



                  the different classes of creditors, allottees and other stakeholders were



                  convened for considering the proposed Revival Scheme.







                  11.    Upon    the     meetings      being   conducted,   the      respective



                  Chairpersons submitted their reports recording the voting pattern of



                  the different classes of stakeholders. The proposed Revival Scheme,



                  having secured the requisite statutory majority, was thereafter



                  considered by the learned Single Judge. By the Impugned Judgment



                  dated 17.02.2020, the learned Company Judge sanctioned the Revival



                  Scheme, while overruling the objections preferred by certain allottees



                  and    objectors     and   issuing    consequential   directions     for   its



                  implementation. According to the Appellants, the Revival Scheme as



                  ultimately sanctioned materially differed from the Scheme which had



                  been placed before the stakeholders for approval and failed to



                  adequately safeguard the interests of certain categories of allottees.







                  12.    In addition to the aforesaid common facts, the Appellant in



                  Company Appeal No.11/2020 has specifically pleaded that the



                  proposed Revival Scheme was founded on suppression of material



                  facts and incorrect disclosures regarding the status of possession, the



Signature Not Verified



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                           Page 8 of 32



12:40:38



                  rights of certain allottees, and the pendency of civil and criminal



                  proceedings. It is further alleged that the Revival Scheme failed to



                  recognise a separate category of allottees who had not accepted



                  possession on account of the absence of the completion certificate and



                  that several statements made in support of the Revival Scheme were



                  factually incorrect.







                  13.    Besides the common challenge to the sanction of the Revival



                  Scheme, the present Appeals also raise certain distinct questions



                  arising out of the individual facts and contractual rights of the



                  respective Appellants. These include, inter alia, the legality of



                  modifications carried out to the Revival Scheme after obtaining the



                  approval of the stakeholders without convening fresh meetings, the



                  validity of the classification of creditors and allottees into separate



                  classes for the purposes of voting, the treatment accorded to different



                  categories of allottees under the sanctioned Scheme, the effect of the



                  Scheme upon the contractual rights flowing from the respective



                  BBAs, and other issues arising from the peculiar facts and contractual



                  arrangements forming the subject matter of the individual Appeals.







                  14.    Having noticed the factual background leading to the sanction



                  of the Revival Scheme and the institution of the present Appeals, this



                  Court shall now proceed to examine the rival submissions advanced



                  on behalf of the parties.







                  CONTENTIONS OF THE PARTIES:







                  15.    Heard learned counsel for the parties at length and perused the



                  record placed before the Court.







Signature Not Verified



Signed By:JAI



NARAYAN



                      CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                      Page 9 of 32



12:40:38



                  16.    Learned counsel appearing on behalf of the Appellants have



                  assailed the Impugned Judgment principally on the ground that the



                  learned Single Judge proceeded to sanction the Revival Scheme



                  merely upon being satisfied that the requisite statutory majority had



                  voted in favour thereof, without adequately examining whether the



                  Revival Scheme, in its substance and effect, was fair, reasonable and



                  equitable to the different categories of allottees. It is submitted that the



                  jurisdiction of the Company Court under Sections 391 to 393 of the



                  Companies Act is not merely ministerial and the Court is required to



                  independently satisfy itself that the Revival Scheme is not oppressive,



                  unconscionable or prejudicial to the interests of the stakeholders who



                  are bound by it.







                  17.    It is further submitted that the Revival Scheme placed before



                  the allottees for voting contained different options, including an option



                  to vote “for, with modification”. According to the Appellants, a



                  substantial number of allottees had voted in favour of the Revival



                  Scheme subject to specific modifications and conditions. Such



                  conditional assent, it is submitted, could not have been treated as an



                  unconditional approval of the Revival Scheme. The learned Single



                  Judge, according to the Appellants, erred in treating the objections and



                  modifications as having been considered and rejected without



                  examining whether the Revival Scheme, as ultimately sanctioned,



                  corresponded with the Revival Scheme which had actually received



                  the requisite approval.







                  18.    The Appellants have also questioned the manner in which the



                  interests of different categories of allottees were dealt with under the



                  Revival Scheme. In particular, the Appellants have pointed out that



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                         Page 10 of 32



12:40:38



                  the contractual rights flowing from the respective BBAs, including the



                  assured returns, lease commitment charges, compensation for delay,



                  interest on defaulted payments and the obligation to provide lawful



                  and usable possession, could not have been diluted or altered merely



                  by sanctioning      a   revival    arrangement, unless    the statutory



                  requirements for such alteration were strictly complied with and the



                  interests of the affected allottees were adequately protected.







                  19.    Learned counsel representing the Appellants have further



                  submitted that material facts concerning the status of the projects, the



                  possession offered to the allottees, the statutory approvals and



                  completion/occupation certificates, the status of the leasehold rights



                  and the pending liabilities of the Company were either not placed



                  before the learned Single Judge in their correct perspective or were not



                  adequately examined while considering the Revival Scheme. It is



                  submitted that the Revival Scheme was premised on representations



                  regarding the feasibility and completion of the projects, whereas the



                  subsequent developments demonstrate that substantial hurdles



                  continued to remain in the implementation of the Scheme.







                  20.    Insofar as the Spire Edge project is concerned, it has been



                  submitted that although possession of certain units in Towers B, C and



                  D had been offered and taken by a large number of allottees, disputes



                  continued regarding the completion of the project, statutory approvals,



                  lease documentation, payment of assured returns and other contractual



                  dues. According to the Appellants, these matters were material to the



                  determination of the rights of the allottees and should have been



                  considered while assessing whether the Revival Scheme adequately



                  protected their interests.



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                       Page 11 of 32



12:40:38



                  21.    The Appellants have also relied upon the subsequent conduct of



                  the parties to demonstrate that the concerns raised by them were not



                  merely speculative. It is pointed out that, even after sanction of the



                  Revival Scheme, considerable difficulties arose in obtaining statutory



                  approvals, renewal of licences, change of status of the Company and



                  handing over of possession of portions of the project. In relation to the



                  Spire Woods project, the revival and renewal of the requisite licence



                  itself remained subject to further proceedings and compliance with



                  conditions imposed by the competent authorities. The Appellants



                  submit that these developments reinforce their contention that the



                  feasibility of the Scheme had not been subjected to adequate scrutiny



                  at the stage of its sanction.







                  22.    It is also submitted that the Revival Scheme contemplated



                  completion of the projects within specified periods and was founded



                  upon certain commitments by the propounders and the proposed



                  developers. The subsequent record, however, discloses that the



                  implementation of the Revival Scheme encountered substantial



                  impediments and that some of the essential steps contemplated under



                  the Revival Scheme were not undertaken within the stipulated time.



                  The Appellants contend that the Court could not have sanctioned the



                  Revival Scheme without satisfying itself, on the material then



                  available, that the proposed mechanism was capable of protecting the



                  investments and contractual rights of the allottees.







                  23.    Per contra, learned counsel representing the Respondents have



                  supported the Impugned Judgment and submitted that the Revival



                  Scheme was approved by the requisite majority of the stakeholders



                  and was consequently binding upon all concerned. It is submitted that



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                       Page 12 of 32



12:40:38



                  the Company was facing liquidation and that the Revival Scheme



                  provided the only realistic mechanism for protecting the interests of



                  the allottees and reviving the projects.







                  24.    It is further submitted on behalf of the Respondents that the



                  majority of the allottees had supported the Revival Scheme and that



                  the Court should not substitute its own view for the commercial



                  wisdom of the stakeholders. Reliance has also been placed upon the



                  progress made after sanction of the Revival Scheme, including



                  infusion of funds by the Propounders, execution of the Joint



                  Development Agreement [hereinafter referred to as „JDA‟] in relation



                  to the Spire Woods project, steps taken for renewal of the requisite



                  licences and permissions and efforts made towards completion and



                  restoration of the projects.







                  25.    In relation to the objections concerning the voting process, it is



                  submitted that the modifications accompanying the ballots were duly



                  noticed and considered by the learned Single Judge and that the



                  substance of the principal objection relating to the continuation of



                  criminal proceedings had already been dealt with in the Impugned



                  Judgment. It is therefore submitted that no prejudice can be said to



                  have been caused to the Appellants on account of the manner in which



                  the votes were considered.







                  26.    The Respondents have also contended that the Appellants



                  represent only a small minority of the allottees and that setting aside



                  the Revival Scheme at this stage would seriously prejudice the large



                  number of allottees who have supported the Revival Scheme and are



                  awaiting completion of their respective projects. It is submitted that



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                       Page 13 of 32



12:40:38



                  the Court should have regard to the interests of the overwhelming



                  majority of the allottees and should not permit a small number of



                  dissenting allottees to frustrate the revival process.







                  27.    No other submissions have been made by learned counsel



                  representing the parties.







                  ANALYSIS AND FINDINGS:







                  28.    This Court has given its thoughtful consideration to the rival



                  submissions advanced by learned counsel representing the Appellants,



                  the propounders of the Revival Scheme, the Company, the Official



                  Liquidator and the other Respondents. This Court has also carefully



                  perused the Revival Scheme, the reports of the Chairpersons of the



                  meetings, the Modification Slip, the objections placed before the



                  learned Single Judge, the Impugned Judgment dated 17.02.2020, the



                  subsequent orders passed in the proceedings arising therefrom and the



                  material placed before this Court during the pendency of the present



                  Appeals.







                  29.    At the outset, this Court deems it appropriate to delineate the



                  scope of interference in an appeal against an order sanctioning a



                  Scheme under Sections 391 to 393 of the Companies Act. There can



                  be no quarrel with the proposition that the Court does not sit in appeal



                  over the commercial wisdom of the creditors or members who, upon



                  being duly informed and acting bona fide, approve a scheme by the



                  requisite statutory majority. The Court is not required to determine



                  whether a different scheme would have been commercially more



                  advantageous or whether the terms of the scheme could have been



                  improved.



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                      Page 14 of 32



12:40:38



                30.      The aforesaid limitation, however, operates only after the Court



                has satisfied itself that the statutory requirements governing sanction



                of the scheme stand fulfilled. The commercial wisdom of the majority



                cannot displace the statutory duty of the Court to ascertain whether the



                scheme placed before the Court is the scheme which was approved by



                the requisite majority, whether the material placed before the voters



                was sufficient to enable an informed decision, whether the class acted



                bona fide and fairly, whether the scheme is just, fair and reasonable to



                the class as a whole, whether it is contrary to law or public policy,



                and, in the case of a company under liquidation, whether the



                arrangement genuinely provides for revival and protection of the



                interests of the stakeholders rather than merely postponing or



                circumventing the consequences of liquidation.







                31.      These principles are not matters of appellate policy but



                constitute the very parameters within which the jurisdiction under



                Sections 391 to 393 of the Companies Act is required to be exercised.



                The decision of the Supreme Court in Meghal Homes (P) Ltd. v.



                Shree Niwas Girni K.K. Samiti & Ors.1, relied upon in the Impugned



                Judgment itself, recognises that the Court must examine whether the



                statutory procedure has been complied with, whether the requisite



                majority has approved the scheme, whether the members or creditors



                had the relevant material to arrive at an informed decision, whether



                the decision is just and fair to the class as a whole, whether the scheme



                is contrary to law or public policy, whether the stakeholders acted



                bona fide and whether the scheme as a whole is just, fair and



                reasonable. The same decision also makes it clear that, once these







                1



                    (2007) 7 SCC 753



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                     Page 15 of 32



12:40:38



                  requirements are satisfied, the Court does not sit in appeal over the



                  commercial wisdom of the majority.







                  32.    Thus, the question before us is not whether the Revival Scheme



                  was commercially preferable to liquidation, nor whether the majority



                  of stakeholders could have arrived at a different commercial



                  arrangement. The question is narrower and anterior: whether the



                  statutory majority contemplated by Section 391(2) of the Companies



                  Act had, in fact, agreed to the Revival Scheme which came to be



                  sanctioned by the learned Single Judge, and whether the Court had



                  before it sufficient material to record the requisite satisfaction for



                  sanction thereof.







                  33.    In the considered view of this Court, this distinction assumes



                  decisive significance in the present case.







                  Re: Votes cast “For, with Modification”







                  34.    The principal difficulty arises from the manner in which the



                  votes cast by the allottees of Blocks B, C and D of the Spire Edge



                  Project have been treated.







                  35.    The Chairman‟s Report records that, out of 384 valid votes, 22



                  votes were cast in favour of the Revival Scheme without modification,



                  293 votes were cast in favour of the Revival Scheme with



                  modification, 19 votes were cast against without modification and 50



                  votes were cast against with modification. Thus, while 315 votes were



                  categorised as being “for” the Revival Scheme, the overwhelming



                  majority, namely 293 votes, were expressly accompanied by



                  modifications.



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                    Page 16 of 32



12:40:38



                  36.    The learned Single Judge noticed the aforesaid voting pattern



                  and recorded that 82% of the valid votes had been cast, by the



                  investors present and voting, in favour of the Revival Scheme,



                  resulting in approval by more than 75% of the creditors present and



                  voting. The learned Single Judge thereafter proceeded on the basis that



                  the majority had approved the Scheme “with modification” and



                  declined to interfere, inter alia, on the ground that the Court could not



                  sit in appeal over the commercial wisdom of the majority.







                  37.    However, this Court is of the considered opinion that the



                  aforesaid approach overlooks the anterior question arising from the



                  very nature of the votes cast.







                  38.    Section 391(2) of the Companies Act requires a majority in



                  number representing three-fourths in value of the creditors, or class of



                  creditors, present and voting, to agree to the compromise or



                  arrangement. The statutory requirement is, therefore, not satisfied



                  merely because a numerical majority has been categorised as having



                  voted “for”. What is required to be ascertained is whether the requisite



                  majority agreed to the arrangement which the Court was ultimately



                  called upon to sanction.







                  39.    A vote cast “for” the Scheme simpliciter expresses assent to the



                  Scheme as placed before the meeting. A vote cast “for, with



                  modification” is, by its very description, conditional upon the



                  modification accompanying the vote. The two cannot be treated as



                  identical without first examining the nature and effect of the condition



                  attached to the latter vote.







Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                       Page 17 of 32



12:40:38



                  40.    This distinction assumes significance where the modifications



                  are substantive and concern the contractual and financial rights of the



                  allottees under the BBAs, including          assured   returns, lease



                  commitment charges and other obligations relating to the projects. The



                  modifications, therefore, could not be treated as merely clerical or



                  inconsequential matters of form.







                  41.    The distinction is therefore not one of form. The modifications



                  went to the substantive rights and obligations of the allottees. If the



                  modifications were accepted, the arrangement assented to by such



                  voters would be one arrangement. If they were rejected, the



                  arrangement would be materially different.







                  42.    Once this position is appreciated, the conditional votes could



                  not have been aggregated with the unconditional votes and treated as



                  an unqualified approval of the Revival Scheme. The learned Single



                  Judge was required to examine the precise terms of the modifications



                  and determine their legal effect before concluding that the requisite



                  statutory majority had approved the Scheme ultimately sanctioned.







                  43.    This Court is conscious that the Chairman‟s Report is an



                  important document and that the voting result recorded therein



                  ordinarily deserves due weight. The present enquiry is not directed



                  towards questioning the manner in which the meeting was conducted



                  or substituting this Court‟s assessment for that of the Chairman. The



                  issue is the legal consequence to be attached to the votes recorded



                  therein while exercising jurisdiction under Section 391 of the



                  Companies Act.







Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                     Page 18 of 32



12:40:38



                  44.    If the 293 votes were conditional upon acceptance of the



                  modifications    and    those    modifications    were     ultimately   not



                  incorporated into the Revival Scheme, such votes could not, without



                  further examination, be treated as unconditional assent to the Scheme



                  in its original form. At the very least, the Court was required to



                  determine whether, notwithstanding the modifications, those votes



                  could lawfully constitute assent to the Scheme ultimately sanctioned.







                  45.    No such exercise is discernible from the Impugned Judgment.



                  The modifications appear to have been considered substantially as



                  objections seeking better terms, while the aggregate votes in favour



                  were treated as constituting the requisite majority. In the considered



                  view of this Court, this conflated two distinct stages of the statutory



                  enquiry: first, whether the requisite majority had agreed to the



                  arrangement; and second, whether the Court should sanction the



                  arrangement so approved.







                  46.    Commercial      wisdom     cannot   be    invoked    to    overcome



                  uncertainty as to whether the statutory majority had, in fact, assented



                  to the arrangement being sanctioned. It becomes relevant only after



                  the existence of the requisite statutory assent is established.







                  47.    This Court is, therefore, unable to sustain the finding that the



                  Revival Scheme had obtained the requisite statutory majority merely



                  by aggregating the votes cast “without modification” with those cast



                  “with modification”, without first determining the legal effect of the



                  conditions attached to the latter category.















Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                         Page 19 of 32



12:40:38



                  Re: Nature of the Modifications and Contractual Rights







                  48.    The Respondents have contended that the modifications sought



                  by the allottees were merely an attempt to secure better terms and that,



                  once the statutory majority had approved the Revival Scheme,



                  individual creditors could not insist upon their preferred terms. There



                  can be no quarrel with the proposition in principle. However, the



                  question in the present case is anterior: whether the votes cast “for,



                  with modification” could be treated as assent to the Revival Scheme in



                  the form ultimately sanctioned.







                  49.    The nature of the modifications assumes significance in this



                  regard. Pursuant to the order dated 11.01.2019, the allottees exercising



                  the option of voting “for, with modifications” were required to attach



                  the proposed modifications to their respective ballot papers. The



                  modifications thus formed part of the manner in which such votes



                  were cast.







                  50.    The language of the Modification Slip makes the nature of the



                  assent clear. The voter first recorded a vote “AGAINST” the Scheme



                  “as currently Proposed” and thereafter voted “FOR” the Scheme



                  subject to deletion of specified clauses and incorporation of further



                  modifications. The assent was, therefore, expressly conditional. The



                  clauses identified in the Modification Slip concerned, inter alia,



                  financial obligations, adjustment of assured returns, payments



                  contemplated under the Scheme, the position of Blocks B, C and D



                  and past-period litigation. These were not matters merely incidental or



                  clerical in nature.







Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                      Page 20 of 32



12:40:38



                  50.1 The Modification Slip has been reproduced under for ready



                  reference:



















Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                              Page 21 of 32



12:40:38



                  51.    The modifications also cannot be viewed entirely divorced from



                  the contractual rights asserted by the allottees under their respective



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                     Page 22 of 32



12:40:38



                  BBAs, including claims relating to assured returns, lease commitment



                  charges, delay compensation and other financial obligations. This



                  Court is not, in these Appeals, adjudicating upon the ultimate



                  entitlement of any individual allottee to such amounts. Their relevance



                  is confined to the question whether the Revival Scheme proposed to



                  affect rights which formed part of the contractual relationship between



                  the Company and the allottees and whether the assent relied upon in



                  support of the Scheme was an informed and unconditional assent.







                  52.    The learned Single Judge was, therefore, required to examine



                  the precise modifications attached to the votes and determine their



                  legal effect. If the modifications were not accepted and were not



                  incorporated into the Revival Scheme, the Court was required to



                  consider whether votes expressly made subject to those modifications



                  could nevertheless constitute assent to the Scheme in the form



                  ultimately sanctioned. Treating the modifications merely as objections



                  seeking better terms did not answer this question.







                  53.    This Court is not holding that contractual rights of allottees



                  cannot be compromised by a Scheme sanctioned under Sections 391



                  to 393 of the Companies Act. Nor is this Court adjudicating upon the



                  merits of the claims raised by the allottees. The limited question is



                  whether, where votes were expressly made subject to substantive



                  modifications affecting such rights, those votes could be counted as



                  unconditional assent to the Scheme without first determining the legal



                  effect of the conditions attached to them.







                  54.    In the considered view of this Court, the aforesaid enquiry was



                  necessary before the votes could be relied upon for establishing the



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                     Page 23 of 32



12:40:38



                  requisite statutory majority. The failure to undertake that enquiry



                  assumes significance in the present case, particularly when the



                  modifications were treated in the Impugned Judgment substantially as



                  objections seeking better terms rather than as conditions attached to



                  the votes themselves.







                  55.    It is also material that the objections raised by the individual



                  allottees were not examined by the learned Single Judge in the manner



                  required. The Impugned Judgment principally considers the objections



                  raised by Spire Edge Maintenance Lease and Facilitation Ltd.



                  („SELFC‟), while the substantive objections of the individual allottees,



                  including those concerning their contractual rights and the effect of



                  the proposed Revival Scheme thereon, do not appear to have been



                  independently examined. Their objections could not have been



                  rejected merely by treating them as an attempt to secure better terms



                  under the Scheme. The Court was required to consider the nature of



                  those objections and determine whether they raised any issue bearing



                  upon the validity, fairness or statutory approval of the Revival



                  Scheme.







                  56.    This omission assumes significance in the present case because



                  the modifications attached to the ballot papers were not unrelated or



                  collateral demands. They concerned matters capable of materially



                  affecting the rights and obligations of the allottees under the BBAs.



                  The learned Single Judge was, therefore, required to examine those



                  objections and the modifications sought before treating the votes cast



                  subject to such modifications as assent to the Revival Scheme as



                  sanctioned. The absence of such an examination cannot be treated as a



                  mere matter of commercial judgment.



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                      Page 24 of 32



12:40:38



                  Re: Informed Decision and Material Disclosure







                  57.    Section 393 of the Companies Act requires that the creditors or



                  members called upon to consider a Scheme be furnished with the



                  material necessary to enable them to take an informed decision. The



                  purpose of this requirement is to ensure that the statutory majority is



                  arrived at upon a proper understanding of the Scheme and its



                  consequences.







                  58.    In the present case, the Revival Scheme concerned two distinct



                  projects, namely, Spire Edge and Spire Woods, involving different



                  categories of allottees, different stages of construction and different



                  contractual arrangements. The Court was, therefore, required to



                  examine whether the material placed before the respective classes was



                  sufficient to enable them to understand the manner in which the



                  Scheme proposed to deal with their respective interests and



                  obligations.







                  59.    This enquiry assumes particular significance where the Revival



                  Scheme seeks to govern existing rights and obligations of allottees



                  under their respective BBAs. The fact that the Scheme was supported



                  by a substantial majority could not dispense with the requirement that



                  such majority should have been furnished the material necessary to



                  make an informed decision.







                  60.    The Impugned Judgment, however, does not disclose any



                  substantive examination of whether the material furnished to the



                  allottees was sufficient for this purpose. In the absence of such



                  examination, the Court could not have proceeded solely on the basis







Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                     Page 25 of 32



12:40:38



                  of the numerical voting result to conclude that the statutory



                  requirement for sanction of the Revival Scheme stood satisfied.







                  Re: Fairness to the Class as a Whole







                  61.    The Respondents have placed considerable reliance upon the



                  fact that 82% of the valid votes, present and voting, in Blocks B, C



                  and D were categorised as being in favour of the Revival Scheme and



                  that the overwhelming majority of the allottees of Spire Woods had



                  also voted in favour. In relation to Spire Woods, 358 out of 364 valid



                  votes were recorded in favour of the Scheme, of which 292 were “with



                  modification”.







                  62.    This Court has no doubt that a substantial majority of the



                  stakeholders supported the revival of the Company and its projects.



                  Such support is undoubtedly relevant, however, the relevant test is



                  whether the Revival Scheme is just, fair and reasonable to the class as



                  a whole. This requires the Court to consider whether the Scheme fairly



                  addresses the interests of the members of the class and the effect



                  which the Scheme proposes to have upon their existing rights.



                  Numerical superiority, by itself, cannot dispense with such an enquiry.







                  63.    At the same time, the mere fact that some stakeholders oppose



                  the Revival Scheme cannot, by itself, justify its rejection. Where the



                  statutory requirements have been complied with, the requisite majority



                  has approved the Scheme and the Scheme is otherwise just, fair and



                  reasonable, the Court cannot interfere merely because some



                  stakeholders may consider an alternative arrangement more beneficial.











Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                     Page 26 of 32



12:40:38



                  64.    In the present case, however, the enquiry into fairness cannot be



                  divorced from the manner in which the approval itself was recorded.



                  The substantial number of votes cast with modifications, coupled with



                  the objections raised by the allottees, required the Court to ascertain



                  whether the Scheme, in the form sanctioned, fairly represented the



                  arrangement to which the class had assented. That enquiry was



                  material to the exercise of jurisdiction under Sections 391 to 393 of



                  the Companies Act.







                  Re: Commercial Wisdom







                  65.    This Court may now examine the principal submission



                  advanced on behalf of the Respondents that the Revival Scheme



                  should not be interfered with, as doing so would amount to an



                  impermissible interference with the commercial wisdom of the



                  majority.







                  66.    There can be no dispute with the proposition. Indeed, the same



                  principle has been recognised by the Supreme Court in Meghal



                  Homes (supra) and by the learned Single Judge in the Impugned



                  Judgment.







                  67.    However, the proposition has no application where the Court is



                  called upon to determine whether the statutory requirements preceding



                  the exercise of such commercial wisdom have been satisfied. The



                  Court is not required to choose between two commercially viable



                  schemes. It is required to determine whether the scheme placed before



                  it was validly approved and whether the process leading to sanction



                  satisfied the statutory safeguards.







Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                      Page 27 of 32



12:40:38



                  68.    In the present case, the interference is not founded upon any



                  disagreement with the commercial decision to revive the Company or



                  the terms of the Revival Scheme. It arises from the failure to



                  determine whether the votes relied upon as constituting the requisite



                  majority amounted, in law, to assent to the Revival Scheme in the



                  form ultimately sanctioned. That enquiry falls within the statutory



                  jurisdiction of the Court and does not constitute an interference with



                  commercial wisdom.







                  Other Grounds Urged:







                  69.    The Appellants have also questioned the feasibility of the



                  proposed revival of the Spire Woods Project, including the sufficiency



                  and certainty of the proposed investment of Rs.20 crores by the new



                  developer, as well as the status of approvals and infrastructure



                  concerning the Spire Edge Project. This Court does not propose to



                  undertake any independent assessment of the commercial sufficiency



                  of the proposed investment or the technical feasibility of the projects.







                  70.    The relevance of these objections is confined to whether the



                  Revival Scheme, particularly when challenged on specific grounds by



                  the    stakeholders,   was    sufficiently   definite   and   capable    of



                  implementation to constitute a genuine arrangement for revival. The



                  subsequent material placed before this Court, including the steps



                  required for renewal of licences and other statutory approvals, does



                  not by itself establish that the Scheme was incapable of



                  implementation on the date of sanction, but does indicate that the



                  concerns regarding its feasibility were not wholly speculative.







Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                         Page 28 of 32



12:40:38



                71.     The Respondents have also relied upon the steps taken after



                sanction of the Revival Scheme, including infusion of funds,



                appointment of consultants and contractors, supervision by the Court



                Appointed Commissioner and efforts towards obtaining requisite



                permissions and renewals. Such subsequent developments are relevant



                circumstances, but cannot retrospectively validate an order of sanction



                if the statutory requirements were not satisfied when the order was



                passed. This Court, therefore, does not interfere on account of any



                subsequent difficulty in implementation or delay in revival. The



                subsequent developments cannot, however, cure any defect in the



                statutory process preceding sanction.







                72.     The Appellants had further objected to clauses of the Revival



                Scheme which contemplated, inter alia, restriction upon proceedings



                by statutory authorities and stay or vacation of pending civil and



                criminal proceedings. The learned Single Judge, relying upon J.I.K.



                Industries Ltd. & Ors. v. Amarlala V. Jumani & Anr.2, and Krishna



                Texport Industries Ltd. v. DCM Ltd.3 had already declined to approve



                the portions which purported to interfere with criminal proceedings.



                This Court finds no occasion to differ from that approach and,



                accordingly, does not base its conclusion upon these clauses.







                73.     Considerable submissions have also been advanced regarding



                the alleged financial irregularities, siphoning of funds and conduct of



                persons associated with the erstwhile management, as well as the



                alleged conduct of some of the Appellants. This Court does not



                consider it necessary to return any finding on such allegations, which







                2



                    (2012) 3 SCC 255



                3



                    (2008) 104 DRJ 101 (DB)



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                   Page 29 of 32



12:40:38



                  remain matters for the competent forums. The learned Single Judge



                  had, in any event, taken supervisory measures by appointing a Court



                  Appointed Commissioner and directing maintenance of funds in an



                  escrow account. Such safeguards may regulate implementation, but



                  cannot cure any defect in the statutory process by which the Revival



                  Scheme was sanctioned.







                  74.    The Respondents have urged that the Appellants constitute only



                  a small group of allottees and that their objections were intended to



                  frustrate the revival process. The number of persons raising



                  objections, however, cannot determine the validity of the order of



                  sanction. Likewise, the mere fact that an allottee seeks enforcement of



                  contractual rights having financial implications cannot, without more,



                  establish mala fides. These considerations may bear upon individual



                  claims, but cannot validate a Scheme if the statutory requirements



                  governing its sanction have not been duly satisfied.







                  75.    This Court is also conscious that setting aside the Revival



                  Scheme may cause prejudice to the allottees who supported it and



                  have been awaiting completion of the projects. That consideration



                  cannot, however, substitute for compliance with the statutory



                  requirements. This Court is not expressing any view that revival is



                  preferable or otherwise to liquidation, nor is it holding that the



                  Company or its projects cannot be revived. The interests of the



                  stakeholders who supported revival would equally require that any



                  arrangement ultimately binding upon them is legally valid and



                  sanctioned in accordance with law.











Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                     Page 30 of 32



12:40:38



                  76.    In view of the aforesaid, the interference in the present Appeals



                  does not proceed upon any assessment of the commercial merits or



                  feasibility of the Revival Scheme, nor upon the subsequent difficulties



                  in its implementation, the conduct of the parties, or the number of



                  stakeholders supporting or opposing it. The interference arises from



                  the foundational question already noticed hereinabove, namely,



                  whether the Scheme in the form sanctioned had obtained the requisite



                  statutory approval and whether the objections and material placed



                  before the learned Single Judge were adequately examined before



                  such sanction was granted.







                  CONCLUSION:







                  77.     On an overall consideration of the matter, this Court is



                  satisfied that the Impugned Judgment dated 17.02.2020 cannot be



                  sustained and is liable to be set aside.







                  78.     The Appeals are, accordingly, allowed and the Impugned



                  Judgment dated 17.02.2020 sanctioning the Revival Scheme is set



                  aside. The matter is remanded to the learned Single Judge for fresh



                  consideration of the Revival Scheme and the objections thereto, in



                  accordance with law.







                  79.     The learned Single Judge shall, while considering the matter



                  afresh, examine the legal effect of the votes cast “for, with



                  modification”, the modifications attached thereto, the objections raised



                  by the individual allottees and other stakeholders, and such other



                  issues as may arise for consideration in accordance with Sections 391



                  to 393 of the Companies Act. If any fresh Scheme or modified



                  arrangement is proposed, the same shall be dealt with in accordance



Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                      Page 31 of 32



12:40:38



                  with the statutory procedure, including convening of meetings,



                  wherever required in law, and furnishing of the material necessary to



                  enable the concerned stakeholders to take an informed decision.







                  80.     It is clarified that this Court has not adjudicated upon the



                  individual claims of any allottee for refund, assured returns, lease



                  commitment charges, penalty, interest, compensation or any other



                  amount under the respective BBAs. All such claims, if otherwise



                  maintainable, shall remain open to be pursued before the forum



                  competent to adjudicate the same.







                  81.     Nothing contained in this Judgment shall affect any criminal



                  proceedings, investigation or proceedings before statutory authorities,



                  which shall continue to be governed by law and by the orders passed



                  by the competent forum.







                  82.     The present batch of Appeals, along with pending



                  applications, shall stand disposed of.







                                                             ANIL KSHETARPAL, J.











                                                                       SHAIL JAIN, J.



                  AUGUST 13, 2026



                  s.godara/shah



















Signature Not Verified



Signed By:JAI



NARAYAN



                     CO.APP. 11/2020 and connected matters



Signing Date:13.08.2026                                                     Page 32 of 32



12:40:38