Skip to main contentSkip to content

Companies Act · source-checked form guide

GNL-4: response to a pending clarification

Sources checked 21 October 2026 · Original author: CA Nikhil Gupta

Provide an addendum correcting defects or incompleteness in a specified application already pending user clarification. It is not a free-standing replacement for an overdue substantive form.

Which version and who acts?

MCA electronic-form field illustration based on the retrieved official instruction kit. Actual current portal fields and the controlling Act/rule govern a real submission; the sample creates no filing.

The person authorised for the underlying form; professional certification follows the underlying form’s actual requirement.

MCA GNL-4 kit pp 6–8: PUCL SRN, company/non-company identity,5(b)rectification,6(a)differentialstamp SRN, conditionalcertification.

Completed field illustration

Fictional example — not for filing. An assumed INC-22 application receives a clarification request on 10 October 2026 because its utility bill image is illegible. The company prepares GNL-4 on 21 October with a readable replacement and an explanation. The assumed clarification deadline is 25 October; no real SRN is supplied.

Prescribed field / blockCompleted fictional entry
1 Relevant-form SRNSYNTHETIC-PUCL-SRN; deliberately invalid model reference; actual status must be Pending user clarification.
3–4 Company identitySYNTHETIC-CIN-01; deliberately not a valid CIN; Aurelia Demonstration Private Limited (fictional); prefilled in a real company-linked response.
Underlying form / requestINC-22; clarification assumed 10/10/2026; reply required 25/10/2026 in this scenario.
5(b) Rectification detailsReplace illegible utility-bill image with readable actual bill for the same premises; no address/event change.
6(a) Differential stamp duty SRNNot applicable to this assumed image-legibility correction; no payment reference invented.
Attachment type / evidenceActual replacement utility bill and point-by-point explanation; no synthetic bill masquerades as evidence.
Certification / signatureFollow actual underlying INC-22 requirements; Not signed. No DSC, certification, SRN, filing or approval has occurred.

The named fields illustrate this scenario. The official reference contains the additional applicable fields, schedules, attachments and declarations. Synthetic identifiers are not valid input for a live filing. No signature, certification, authority action or successful filing is represented.

Check the dates, amounts and legal branch

Prepare, submit and retain the evidence

  1. Read the actual clarification notice and confirm the underlying SRN/status, defect and deadline.
  2. Correct precisely the requested defect, attach genuine replacement evidence and explain every requested point without changing unrelated facts.
  3. Submit through the permitted response route and track the real application outcome; retain original and corrected documents together.

Download the right reference and sample

Official prescribed referenceFilled sample: fictional field illustration

The reference preserves the complete official source document. Use the physical PDF page locators above to find this form; adjacent forms and amendment provisions may share a page. The sample is a static educational model, not an MCA utility, statutory approval or executed filing.

Primary authorities and exact locators

Questions readers ask

What does this PDF complete?

It illustrates the named prescribed fields with fictional facts. The real statutory document must include every applicable field and annexure, supported by actual records and authorised verification.

Does downloading the sample create a filing or approval?

No. Follow the specific preparation and submission steps above. The actual portal acknowledgement, authority decision or signed professional report is separate evidence.

Continue to related material