Skip to main content
Property, Real Estate & RERA

Ready-to-Move Property: Tax and Possession Checklist

Ready-to-Move Property: Tax and Possession Checklist
CA Nikhil Gupta·Reviewed 6 June 2026·3 min readReal Estate

A ready-property closing checklist covering title, occupancy approval, GST timing, stamp duty, registration, dues and possession.

2-minute answer: Before paying or taking possession, verify title/encumbrances/occupancy approval independently of the brochure, confirm whether GST applies based on the completion-certificate timing (not the sales pitch), pay only through banking channels to the registered entity, and record possession (keys, meters, dues, defects) in writing - a registered sale deed and mutation are separate steps from occupancy approval, not substitutes for it.

The objective is to convert a high-value property decision into a record that can be independently checked before payment, possession or dispute.

Core rule

Confirm the seller’s legal right to sell before anything else - title, authority to act, any charge or mortgage, and the approvals the sale actually depends on.

Evidence

GST timing hinges on one date: if the builder receives the full price only after the completion certificate or first occupation, the sale is treated as a completed-property sale, not a construction service - so GST generally does not apply to that consideration.

Risk

Stamp duty, registration value and local charges are State-specific.

Control

Possession should record keys, meters, fixtures, dues and condition.

What the buyer should understand

  • Verify title, authority, encumbrances, approvals and right to convey.
  • Where the entire consideration is received after completion certificate or first occupation, construction-service GST generally does not apply.
  • Stamp duty, registration value and local charges are State-specific.
  • Possession should record keys, meters, fixtures, dues and condition.
  • Occupancy approval does not replace sale-deed registration, mutation or utility updates.

The five-point review

CheckWhat to examine
Project or propertyExact phase, unit, seller/promoter and authority.
Legal recordTitle, RERA, approval, agreement or tenancy record.
MoneyPrice, taxes, demands, loan and payment trail.
Physical statusConstruction, possession, defects, utilities or occupancy.
RemedyCorrection, possession, refund, compensation or escalation.

Practical example

A builder has an occupancy certificate but requests part of the price in cash and promises registration at a lower value.

How to apply the framework

Fix the project, phase, unit and legal actor

Identify the promoter or seller, exact registered project phase, unit, competent authority, lender and payee. Similar project names, sister companies and neighbouring phases are common sources of error. A document for another tower or phase does not validate the buyer's unit.

Reconcile public records with the contract

Compare the relevant State RERA portal, sanctioned plans, local approvals, agreement, payment schedule, tax invoices, lender records and possession documents. Save the versions relied upon. RERA registration is an important transparency control, but it is not a title certificate and does not replace independent legal, engineering, tax or valuation work.

Keep every payment and representation traceable

Pay through banking channels to the correct legal entity, obtain receipts and maintain a cumulative payment ledger. Preserve brochures, emails, messages, demand letters and written promises. Do not rely on a broker or relationship manager to reconstruct the transaction after personnel change or dispute.

Apply current tax and lending forms

Current-law status: for transactions up to 31 March 2026, property TDS under the Income-tax Act, 1961 uses the Form 26QB process; for transactions from 1 April 2026, the Income-tax Act, 2025 governs and the equivalent filing is Form 141 Schedule B - do not copy the legacy 26QB process into a post-1-April-2026 closing. Construction-service GST is governed by the CGST Act, 2017 (stable, not affected by the income-tax Act change). For home-loan insurance, the actual issued policy wording and schedule—not the sales pitch—control cover and claims.

Choose the remedy only after defining the objective

Possession, refund, interest, compensation, cancellation, loan restructuring and project completion can require different evidence and forums. RERA procedure, stamp duty, registration, tenancy, approvals and local property law vary by State and authority. Insolvency and lender security can also affect recovery. Obtain qualified advice before parallel or irreversible proceedings.

Implementation checkpoint

Before treating a milestone as complete, verify the live outcome: registered agreement, credited payment, accepted TDS statement, lender disbursement, revised amortisation, valid occupancy or completion approval, documented possession, repaired defect, society handover or registered complaint. Record the acknowledgement number, date, next deadline and unresolved mismatch.

Action checklist

  • Download current official records.
  • Match records with the agreement.
  • Verify every payment and payee.
  • Preserve photographs and communications.
  • Define the exact relief or decision.
  • Obtain State-specific legal and technical review.

Evidence to keep

  • RERA/title/approval records
  • Agreement, allotment and schedules
  • Demand, invoice and payment trail
  • Photographs, inspections and communications
  • Complaint, handover or settlement acknowledgements

Warning signs

  • Cash or personal-account demand
  • Brochure conflicts with contract
  • Approval cannot be verified
  • Verbal-only promise
  • One phase or unit confused with another

Finin2min takeaway

In property, the strongest protection is a consistent trail from public approval to contract, payment, construction, loan and possession.

Frequently Asked Questions

Does RERA registration prove clear title? â–¼
No.
Can rules differ by State? â–¼
Yes. RERA procedure, stamp duty, registration, tenancy and local approvals can vary by State and authority.
Should verbal promises be relied upon? â–¼
Material promises should be documented.
Can this guide replace a property lawyer or engineer? â–¼
No.

Source and review trail

Use the current official instrument, portal or regulator publication before acting. This panel separates the category authority from page-specific references.

Primary category
Property, Real Estate & RERA
Official starting point
mohua.gov.in

Page source links

HomeInsightsInsightsGlossaryEditorial PolicyMethodologyLegal

© 2026 Finin2min. For informational purposes only.