Skip to content
SEBI S3B-1 - controlled source map

SEBI (Issue of Capital and Disclosure Requirements) Regulations, 2018

Grouped numbered-control map linked to the exact SEBI consolidated source and the existing Finin2min decision guides. This route is held from indexation until the full proviso, explanation, Schedule and amendment-note extraction completes a second legal review.

SEBI HubSource maps › ICDR
Publication control: noindex,follow. The official consolidated Regulation is controlling. The table below maps the current professional control guides; it is not a verbatim reproduction or a substitute for the numbered legal text.

Current legal position

Current consolidated record last amended on 21 March 2026.

Source review: 21 March 2026

Closure status

SOURCE ANCHORED

Principal current source and grouped control map linked. Full regulation-by-regulation proviso, explanation, footnote and Schedule extraction remains open.

Grouped numbered-control map

#Control routeDecision purposeNumbered anchors recorded in current guide
1Scope, definitions and issue classificationClassify IPO, FPO, rights, preferential, QIP, bonus, SME or other issue before opening the relevant chapterRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
2Issuer and issue eligibilityApply Regulation 6 and route-specific eligibility, ineligibility, promoter, default and track-record testsRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
3Intermediaries and responsibility matrixAllocate responsibilities among issuer, merchant banker, registrar, underwriter, syndicate, monitoring agency, exchanges and depositoriesRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
4Issue structure, promoter contribution and lock-inControl capital structure, reservations, minimum contribution, lock-in, pledges and non-transferable markingsRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
5Offer documents, applications and allotmentcontrol guide SEBI Hub › ICDR › Offer documents, applications and allotment Finin2min Summary — in 2 Minutes Decision: Manage draft/final documents, observations, advertisements, ASBA/UPI, bidding, basis of allotment and refundsRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
6Pricing, book building and issue economicsApply price-band, floor-price, allocation, minimum-subscription and issue-expense controls for the chosen routeRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
7Disclosure, monitoring and post-issue reportingControl risk factors, objects, use of proceeds, monitoring reports, advertisements and post-issue filingsRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
8Due diligence and regulatory consequencesMaintain documentary support for merchant-banker due diligence, expert reports, misstatement risk and SEBI directionsRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
9Schedules, forms and disclosure architectureUse the route-specific Schedules and current SEBI/exchange filing formatsRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
10Amendment and implementation controlcontrol | Finin2min Fin in2min Knowledge SEBI Hub Priority Regulations Calculators ICDR · R-10 Amendment and implementation control Map the 21 March 2026 amendment and the 8 April pledged-share lock-in circular to affected issue processesRegulations 1–3 and Regulation 6 eligibility; issue-specific Chapters and disclosure Schedules; 8 April 2026 circular operationalising lock-in of pledged shares
How to use: freeze the event date and facts; open the exact SEBI source; locate the numbered provision, proviso, explanation and Schedule; then use the linked Finin2min guide for workflow, evidence and escalation.
Next closure gate: extract every numbered Regulation and inserted suffix (for example 50A), all provisos/explanations, Schedules, footnote amendment lineage and commencement dates; conduct a second reviewer check before changing this route's publication status.